Paper

Research on the Modeling of Xiaosha River Artificial Wetland and the Scheduling Program of Water Quality and Quantity


Authors:
Guanghua Shao; Lei Bian; Xipeng Wang; Qun Miao
Abstract
During the research of Xinxue River artificial wetland of Nansi Lake, through consulting literature and inferred analysis, BP neural network forecasting model of Xiaosha River artificial wetland is selected to carry on follow-up study. Because Xiaosha River artificial wetland is in the planning and design stage, and the establish of BP neural network forecasting model requires large amounts of data, therefore this paper built virtual data of influent quantity and quality and effluent quality, and studied on the modeling of Xiaosha River artificial wetland and the scheduling program of water quality and quantity.
Keywords
BP Neural Network; Virtual Data; Construction of Model; Scheduling of Water Quantity and Quality
StartPage
61
EndPage
64
Doi
Download | Back to Issue| Archive